Showing posts with label Friends' Favourite. Show all posts
Showing posts with label Friends' Favourite. Show all posts

Saturday, 26 September 2026

Almost Threw In the Towel

I'm at my tipping point with Blogger. I had more than enough of its sh*tnanigans but I've been patient. This time though I almost quit. What happened you ask. None of the posts from the hundred of blogs I follow showed up in my reading list. Not one!! Well, what kind of crappy monster is that ??

Am I to go in my list of blogs I follow and open them one by one to check if you've published a new post?? Like I have nothing to do all day?!! Although, I did see that many haven't post in a very long time. :^(


ANYWHO!! 

I turned on Blogger every other day or so, to check if they'd fixed the problem. I was thinking of publising just one last post with the news that I am moving to Instagram and am cancelling my blogger account when Blogger finally populated my reading list with the latest posts. I was this close. THIS close!! 
Which makes me very sad because I've met so many lovely people and I was missing them these past weeks. 

Moving on. 

This MIA baby quilt was found.
It was safely in a bag with the other
baby quilts but under a different number. Yay! 



You can now see the quilts made for the baby quilt drive in the tab ^Baby Quilt Drive^ on top of this page. I stopped adding the photos when Blogger shunned my reading list. Hopefully, I'll be able to add the others this weekend. I need to take care (or empty) my garden in containers too. The nights are very cold lately. Sigh! It's that time. 

Slow Stitching


The red dye from the chicken fabric started to bleed onto the neutral piece next to it. That's very weird because the quilt hasn't been in water yet. So, why did it start to bleed? Why is the blue-lined piece not affected by it?  
Since we are talking about Friends' Favourite let's check the stats. 

Friends' Favourite Stats: 
If I quilt one block a day, it will be done by March 18, 2027.

Monday, August 24th: required blocks 47 
                                    blocks done 64 - 4 rows finished 

Monday, September 7th: required blocks 61 
                                    blocks done 96 - 6 rows finished 

Monday, September 21th: required blocks 75 
                                    blocks done 128 - 8 rows finished 
The half point has been reached. Yay! Yes, I am doing one row per week so far. I have the firm intention of finishing row 9 this weekend. If I can keep this up the quilt will be done before Christmas. I'm in shock. I didn't thought I could find so much time to quilt. Working only 4 hours per day at the office really helps me accomplish this though. 

On the Crumb Front
Crumb blocks trimmed at 4.5 inches. 

Crumb blocks trimmed at 6.5 inches. 

Picture of the bobs and bits bag taken in June. 

Picture of the same bobs and bits bag this morning. It has the Mary Popping's bag ability of refilling itself, lol. I started yet another bag of bob and bits so I'll stop adding to this one and finally see it diminish. 

I'm thinking of doing a crumb sashing for the crumb star quilt. I keep the end of the rolls of the thermal paper from the payment machine from the office to sew the bits on it. I did one. I won't do a second one. I don't like this technic of sewing on paper. So, this container is now empty and the crumb sashing will be sewn like any other crumb blocks. 


What else have I done? Oh yes. 
Remember these squares I received from Françoise? They were sewn back to back, ready to become a rag quilt. I unstitched them.
There are 44 pairs of these. 

I now have 88 squares and a little hill of used thread. They will become a pieced backing for a baby quilt (or two) at some point. 

The Sewing Room Saga

The reorganization of the sewing room continues. I got this little white shelf cabinet and stuffed it with what needs to be cut to useable sizes. On top and under the ironing board are the containers of the useable sizes I use. On the far right, there's a box of whites and under that some all prepped bindings. 


You might not remember my rainbow shelf so here's an old photo of it. These shelves are next to my computer. Not the best of place for scraps, so . . . 


. . .  the shelves now hold my sewing projects. Well, some of them. 


The milk crates are holding the rainbow scrap baskets and bags. This wall is behind me when I'm at my sewing machine so it's more convenient this way.


It's not perfect but I'm getting there. In the crates on the right, top and middle one, are fabric I either have to cut or add to the bobs and bits bag. Again! Lol. The bottom crate tries to hold the brown scraps. 


In a previous post, I showed photos of our Wednesday Sewing Club in Lucie's garage. Some of you asked about the garage "window" in the photo. Here's another photo of it. 

Her husband made some panels/sections with 1 X 1 inch sticks and covered with screens. They get screwed together every summer and set in the garage door opening. No bugs can sneak in. Such a cool idea.  

This is what the ladies were working on when I was there last. 




I didn't get a photo of what Lucie was working on. Also missed Claire, Sonia, Michelle's projects. Sorry. I'm a bad photographer when I talk. Haha. The garage is now closed for winter. :^(


That's it for now. I wish you all some happy sewing time and good health. 
;^)

(I hope my post gets in your reading list.)

I'll try to catch these talented ladies' link-party. See you there.
Angela at So Scrappy
Frédérique at Patchwork and Quilts
Alycia for Finished or Not Friday
Kathy Quilts for Slow Sunday Stitching 
Cynthia for Oh Scrap!


Friday, 28 August 2026

So, You Made a Scrappy Quilt

and you THINK you've mixed all the scraps up so that the colours are well balanced across the whole quilt. You've looked at it and looked at it again and again, from every angle, and you've removed certain prints to add more variety or you've moved them around several times to see WHERE was the best place for this or that pattern. You made all the decisions yourself to make sure everything was perfect. 

Riiiiigghhtt!!!! 

And you are so proud of this beautiful scrappy quilt that you decide to hand quilt it. 




The brain is such a wonderful piece of art. Since the beginning of time, humans have sorted and stored things. Innocently, it started with grains and seeds to grow them again the next year, making sure not to mix the seeds, etc., and things evolved and we started sorting and storing bigger things by groups and categories, and labelling everything, etc. 

I believe this process is now in my brain's DNA. Look at a close-up of the image above. What do you see? 

Circles,  

Circles, 

Circles!! 


These 3 prints are one above the other one, meaning in different rows but same column. My brain told me the colours were evenly spread. I forgot to ask my brain if the PATTERNS were repetitive! 

Now, if we look at the left of these circles, we will see a fox (and circles)


Look up at the print above this one and you will find 


a fox ! 

I am NOT kidding you. Go back up to the second image and look at it again. You'll see. It's all there. 

Did you see the green dot to the left of the fox? Guess what? 



Yep! 

Dots, dots, dots!! 

I have one of the craziest brain. Even when I don't want to overthink something and have it all sorted out, I do it anyway! I'm SO good. 😇😂 



I've been doing very well with the quilting on this quilt - Friends' Favourite. 
If I quilt one block a day, it will be done by March 18, 2027. That is the challenge. 

Meaning on Monday, August 17, I should have 40 blocks done. Instead, I had 48 blocks done, INCLUDING the sashing. Three rows were done. Yay me!! 


The hardest part is the first and last block of each row. As you can see the quilt is so big that it's very close to the frame. It is very awkward and cumbersome to sew the end blocks. It takes me longer than the rest of the row. 
 
Some crumbs got together


There are 16 blocks per row. So, I was thinking:  if I quilt 2 blocks a day there would be 14 blocks done at the end of the week. So, if I were to quilt 2 blocks and a bit, I could finish  one row every week. 😲

More crumbs

I know I shouldn't push myself like this because I don't want it to become a chore. It is a relaxing exercise and I want to keep it that way but GOSH! it's tempting. 

Just one more crumb block, I promise

With September sitting on my doorstep, the winter routine will start soon. Actually, September first is my group first meeting, so I wouldn't be able to quilt that evening. Then, the baby quilt drive will take center stage once again, not to mention a retreat in October. This means many evenings with no quilting time. As life gets busier, it will become harder to keep that fast pace of 2 blocks and a bit per day.

Did a crumb star instead, lol. 


So, on Monday, August 24, I had the fourth row finished. WHHAAATT!!?? Yes, because I though I might as well make the most of it while I can because soon I'll be too busy. There are days when I don't really feel like quilting and then I hear myself say "get the sucker done and move on" and I just do it. Lol. (Blocks required : 47 - Done : 64) 

Now that my fingers and wrist are stronger compared to the first few days of quilting, I can quilt longer. The issue now is my back. It's started to complain. It doesn't like the long sitting session, bent over the quilt. It will be another thing to take into consideration in my 2 blocks and a bit per day shenanigans. 

This one, I did do on purpose.
They aren't the same print as the little piece
is not perfectly arched like the square one is but they are so cute. 
Maybe this is where my brain thought it was okay to do associations? 


While I sewed some pieced-backings for the baby quilts, I managed to get a few crumbs blocks together. And a star. (Shown in the photos today)


Hope all is well with you and you get to sew a little bit every day. 
;^)


And I'll try to catch these talented ladies' link-party. See you there.
Angela at So Scrappy
Frédérique at Patchwork and Quilts
Alycia for Finished or Not Friday
Kathy Quilts for Slow Sunday Stitching 
Cynthia for Oh Scrap!


Saturday, 25 July 2026

This Week Was Fun

And what a week it was! 

First and foremost, my youngest DS told us he got a job. His formation was on Friday (yesterday) and he's starting next Tuesday. It's a contract for 6 weeks and I am SO happy for him. (Six weeks is better than nothing.)

DH finally got back to work (after two weeks at home, nursing a nasty cut on his thumb) with his sore thumb but he managed to tough each and every day out. Yay! 

Some of you asked about MY work at the office. If I start later in the morning, do I work later in the afternoon?  No. My work hours were cut at both ends. (ouch, says my budget.) From 8:30 to 4:30 (lots of weeks until 5pm), I now work from 10am to 2pm. Or at least that's the plan. I still work until 3:30 - 4pm when there are many meetings to help Danika with the clients. Yes, I know, I used to do it all by myself but she doesn't have an ADHD brain (firing on all 8 cylinders) and the load of experience in customer service I have (she's 19, I'm 63, enough said).  I have good hopes for her. 

Also at work this week, I received my own laptop. My email signature now says Administrative Assistant instead of Reception. My new tasks have also been received. Fun! So, this being said: 
let's sew!

 

Some crumb blocks in whatever-comes-out-of-the-bag and more in aqua. (4.5" and 6.5")


Two 18-Bricks blocks. One in Aqua and the other one in Seafoam Green. Is Seafoam part of Aqua, Turquoise, Teal? Well, I thought it was so I made a block. I know! The butterfly print is in both blocks but I had to use what's on hand, right? 

When sewing crumb blocks, I work on a few blocks at a time (like any true ADHD person would do, lol). Some might be sewn together to reach the perfect size, whether it's for 4.5" or 6.5" or a 8.5 X 6.5" block. The pink one, on the right side, might be big enough for a 6.5" square. I'll iron, measure and trim that one today. 

The chair at my sewing desk is now empty. That big pile has been dealt with. (see last post)
Friday night (yesterday), I challenged myself again. 

The Challenge 

I have (at least) three bags and a drawer of rainbow-coloured strings. I have a drawer (like the one in the photo) for neutral (full) and another one of black (half-full). This rainbow one has been overflowing for years, hence the three bags. Obviously, I still can't close the drawer. It is time to stop stuffing bags and to REALLY tackle the problem. So I did.  

The mess 

One bag down, two to go. 

The progress

Once the three bags were done, I went to bed. My legs were so numb from sitting on the floor. So, this morning (Saturday), the sorting continued. 

Empty, at last

Two cups of coffee and one and a half hour later!! 

The result

Plastic bags are hard to photograph. I didn't pay much attention to the size of these strings. I was watching Project Runway on TV. I did remove some bits and bobs that can't be call "strings" by any definitions. I'm sure more can be remove but won't make much of a difference. The black and greys are together. Other groups include whites, beige, dark whites, yellow, light green, dark green, light blue, dark blue, pink, purple, red, orange, brown, multi-coloured and a jelly roll. I haven't bought that jelly roll so it must have come in a gifted bag or was free with a purchase I did at some point. Can't remember. Guess what colour the jelly roll is? Pastel! So, Angela!  I am ready for Pastel month next year. Lol. 

What prompt this challenge: Terry! Have you seen her string quilt? Click on the link. You won't regret it. 

Early in the mornings, now that I start work later, what do I do? Have coffee on the deck with the cats, do stretches and then I'm suppose to be cleaning the sewing room but Friends' Favourite keeps calling me.

It is set in the loft (the game room), not the sewing room

I timed myself and it takes 20 minutes to do one square including stitching the neutral frame around the square. Like this: 

(Little kitty watching you from the upper left corner. )


The quilting in the coloured sashing is another 15-20 minutes. I'm sewing straight (trying to keep it straight) down the middle of the frames and sashing. So, instead of sewing 1/4 inch in the square, I decided to go with 1/2 inch there too. I thought of doing fancy flowers and butterflies, but then thought if I want to finish this soon, better keep it simple. 

I calculated that if I sew one block a day, it would be done by March 18, 2027. That's not counting the sashing part. I wonder if I can finish it before that. Dare to bet?  Lol. 

So, that's what happened this past week. Hopefully, I can sew some more this weekend. How about you? Hope you find time to sew something too. 

Take care. ;^)

And I'll try to catch these talented ladies' link-party. See you there.
Angela at So Scrappy
Frédérique at Patchwork and Quilts
Alycia for Finished or Not Friday
Kathy for Slow Sunday Stitching
Cynthia for Oh Scrap!



Saturday, 18 July 2026

Galactic Project

At work, some of my tasks have changed. The one I'm really happy about is starting at 10am instead of 8:30. It gives me more time to do things in the house while I have the energy to do it. So . . . 



I gave myself a little goal : cleaning the disaster in my sewing room. A little goal, lolll. It's more of a galactic proportion but if I keep at it, a little every morning, it will get done, right?

Because of my super power, (see last post) the top of these boxes was piled high, full of *stuff*. I grabbed all and dumped it on my chair. This is what I have to do this week. And on the sewing machine table, yes, you are right. 



I don't know exactly what's in there but there are flannel backings for the baby quilts and a whole lot of *miscellaneous* fabric. Surprise! 
So, I sorted, cut and/or folded and put away. 


Here’s an example of what’s in the pile. These scraps (maybe 25 pieces) are left over from the fabric we cut for the baby quilt' tops. I didn’t have the time or the energy to trim them and put them away properly when they returned to me. They were just *piled* (stacked). Now, it's time to cut them into useable sizes. 


The end result : (4) 5" triangles, (2) 2.5" triangles, (2) 2.5 X 4.5 rectangles, (8) 3" squares, (8) 2.5" squares, (2) 2" squares, (3) 2' strips of different length, (3) 1.5 X 2.5", (3) 1.5" strip of different length and (1) 1.5' square. I was so happy about this little "clean up" that I grabbed another one and cut some more. 


It's a leftover too but I really don't like this fabric. The teddy bears behind the white grid do something to me and blur my vision. It's worst in person. The camera lens kind of lessen the effect somehow but I think you can see what I mean. Anywho! I was still determined to cut it up. Started with the bigger chunks and worked my way down. 


 

The end result : cut strips at 2.5" for binding; there was enough for 228" long binding. Whoohoo! Then (3) 5" squares, (3) 4.5" squares, (1) 3.5 square, (1) 3" square, (2) 2.5 X 4.5", (4) 2.5" triangles, (3) 2" strips and (2) 2" squares, (2) 1.5" squares and (2) 1.5 X 2.5" rectangles. I'm glad this one is behind me. Phew! 

Needless to say that these cutting sessions are adding bits and bobs in the bag I want to empty. Scraps of fabric will exist as long as the sun rises from the East. Haha.

The chair is still full of stuff. I will continue to work on it this weekend. 

I found this box. Thinking it was leftover fabric again, I thought I could put the fabric away and get rid of the box but, wait! It's a project. 


I had to look it up because I couldn't remember the name of this mystery by Bonnie Hunter back 2016. It's *En Provence*. 

So many pieces cut and sewn but not much put together yet. I gathered everything in a plastic bag with more instructions and set it aside. 
It prompted me to have a place for my "started" projects. It will be easier for me to know what I have and mostly where it is. When I leave for a sewing retreat, I'll just dive into this milk crate and get a few projects out to bring along. As you can see, En Provence didn't stay alone in there for long. Lol. 


A quick scan around the sewing room has revealed more PiGs. I'm sure more will join these one as I continue to declutter.

It brings me to show what I did sew last weekend. (nothing got sewn this past week. Too much cutting! Ha!) 


The purple crumb block you see on my sewing machine in the last post now measures 6.5" square (untrimmed). I added an orange one and a little 4.5" square for the Crumb Star project. I also added the points to this centre to have a second aqua star. This one has dusty rose fabrics from light to very dark. 

I was also able to find enough of these "in-between" reds to finish an 18 Bricks block. 

From dusty rose to bloody orange along with watermelon, salmon, coral pink and tomato reds. All the fun ones are in there. 


Lastly, I got Friends' Favourite on the frame (FINALLY!) and hand-quilted one square. Only 255 to go, lol. 

It's raining here this weekend. More time in the sewing room for me. Hope you get to add a few stitches to whatever project you are working on. 
;^)

And I'll try to catch these talented ladies' link-party. See you there. 
Angela at So Scrappy
Frédérique at Patchwork and Quilts
Cynthia for Oh Scrap!